Infrastructure & Data Centers

Data centers, airports, hospitals and the transit networks that connect them. Critical infrastructure that has to stay on.

The shape of the work

Where we focus.

Critical-infrastructure facilities run on the same electrical and mechanical fundamentals as industrial plants — but with even tighter uptime requirements. Data centers in particular need power distribution, cooling and monitoring that won't blink.

We supply the industrial-grade UPS systems, switchgear, BMS controllers, motors and chillers that go into these facilities, and our EPC capability extends to electrical balance of plant for data center campuses.

Signature engagements

Where we're typically called in.

Tier III / IV data center electrical balance of plant
Airport HV and MV distribution
Hospital emergency power and isolation transformers
BMS and energy monitoring integration
Critical-power UPS and STS modules
What we supply

Replacement parts and equipment we carry.

Industrial UPS modules and battery cabinets
Static transfer switches and automatic transfer switches
MV switchgear and ring main units
Building management system controllers
Industrial PLCs and SCADA for facility monitoring
High-efficiency chilled-water plant equipment
Service programmes

Spare-parts and reliability programmes

  • · Critical-power gap analysis and upgrade
  • · BMS integration with electrical and mechanical subsystems
  • · Facility-wide PLC migration
EPC scope

New-build and revamp scope we deliver

  • · Data center electrical EPC (HV / MV / LV)
  • · Airport and transit electrical infrastructure
  • · Hospital MEP balance of plant
  • · Large commercial complex utility build-out
Failure modes we see

Real-world failure modes engineers encounter.

MV switchgear arc-flash on failed CT/VT

Current/voltage transformer failure on metal-clad switchgear can propagate to a phase-to-phase fault; arc-flash mitigation and timely PD monitoring matter.

Cast-resin transformer thermal trip

Indoor cast-resin transformers in data-center electrical rooms trip on overheating when room ventilation is undersized for ambient.

UPS battery-bank capacity drift

VRLA battery banks in critical-power UPS systems drift in capacity well before end-of-warranty; quarterly impedance testing catches this.

BMS controller communication loss

Building-management-system controllers drop off the network when MAC table sizes exceed switch capacity; managed switches with proper VLAN segmentation avoid this.

Standards we work to

The codes that frame infrastructure & data centers procurement.

Recommended Practice for Harmonic Control in Electrical Power Systems
High-Voltage Switchgear and Controlgear
Telecommunications Infrastructure Standard for Data Centers
National Electrical Code

Regulatory landscape

Data-center and critical-infrastructure procurement in MENA is governed by the local utility's electrical code (DEWA Distribution Standards, KAHRAMAA Wiring Regulations, KSA Building Code 401 for electrical) plus international tier-rating frameworks (TIA-942, Uptime Institute). FAHSS conformity (UAE), SABER (Saudi Arabia) and G-Mark (GCC) apply to most electrical balance-of-plant equipment. Seismic compliance is often called out for MV/HV switchgear in Saudi Arabia's Western Region. For data-center campuses, the specific cloud-provider's technical specification (AWS, Azure, Google) layers on top of local code.

Long-tail buyer questions

What buyers actually ask about infrastructure & data centers.

Can you supply DEWA-approved MV switchgear for a Tier III data center campus?+

Yes — pre-qualified switchgear and transformer manufacturers from the buyer's and DEWA's approved-vendor lists, DEWA witness on factory routine tests, FAHSS conformity declarations, and phased shipment to align with the contractor's installation sequence.

What is the typical lead time for cast-resin distribution transformers landed in Dubai?+

For DEWA-approved cast-resin distribution transformers, 16–24 weeks from PO is typical depending on rating and the manufacturer's allocation. Sealed indoor units, full type-test certificates, FAHSS conformity included.

Do you handle UPS battery-bank specification for a critical-power application?+

Yes. We size battery banks against real load profiles, specify VRLA or Li-ion per the cycling regime, and include impedance-monitoring instrumentation in the BoM. UPS modules from major manufacturers with N+1 or 2N topology depending on tier requirement.

Common procurement scenarios

What buyers typically ask about Infrastructure & Data Centers.

How to ensure generator set meets data center load requirements in MENA?+

Verify the generator's kVA rating matches your critical load plus redundancy. In MENA, ambient temperature derating is crucial; ensure the set is rated for 50°C or higher. Check for fast transient response (<10%) and compliance with ISO 8528. Specify a paralleling system for N+1 redundancy. Always request a load bank test report from the supplier.

What cooling system is best for data center UPS in hot climates?+

For UPS systems in MENA, liquid cooling is preferred over air-cooled due to high ambient temperatures. Ensure the cooling system can handle the UPS heat rejection at 50°C. Look for redundant pumps and chillers. For smaller installations, precision air conditioning with glycol or chilled water loops works. Always verify the cooling capacity in the site's worst-case conditions.

How to specify switchgear for a data center in a high seismic zone?+

Specify switchgear certified to IEC 62271 or ANSI C37 with seismic qualification per IEEE 693. In MENA, zones like Dubai require high seismic performance. Request a seismic test report or finite element analysis. Ensure the switchgear has rigid bus bars, reinforced enclosures, and anchored components. Also, consider arc flash mitigation and remote racking for safety.