Oil & Gas
Upstream, midstream, downstream. From a single Christmas-tree component to a full refinery upgrade, we have the procurement reach and the engineering team.
Where we focus.
The hydrocarbon supply chain is unforgiving — a missing actuator, a counterfeit pressure transmitter, a wrong gasket and a unit goes down for days. We supply only new, genuine OEM parts and we audit every step.
Our regional EPC capability covers refinery debottlenecking, gas-treatment trains, pipeline pump stations, storage terminals and offshore facility engineering. We work to API, ASME, NACE and IEC standards as a matter of course.
Where we're typically called in.
Replacement parts and equipment we carry.
Spare-parts and reliability programmes
- · Turnaround and shutdown spare parts packaging
- · Vendor-managed inventory for major operators
- · Inspection at origin with third-party witnesses
- · API-certified materials traceability
New-build and revamp scope we deliver
- · Refinery upgrades and revamp projects
- · Gas processing facility EPC (sour-gas handling)
- · Pipeline pump and compressor station construction
- · Crude and product storage terminals
- · Loading and offloading facilities
- · Onshore production facilities and FPSO support
Real-world failure modes engineers encounter.
Mechanical seal failure on hot-service pumps
Single-seal arrangements on hydrocarbon pumps above 200 °C see MTBF in single-digit months without cartridge upgrades and proper seal-support systems.
Control-valve trim erosion (sour service)
H₂S and erosive solids destroy standard stainless trims in months; Stellite, hardened or ceramic trims are mandatory in sour-service lines.
Instrument-impulse-line plugging in waxy crude
Differential-pressure transmitters drift or fail when impulse lines plug; heated impulse lines and remote diaphragm seals are the usual fix.
PSV chatter and seat damage
Pressure-relief valves chatter when sized too large for the relief case; seat damage propagates and can lead to under-relief on the next event.
Motor bearing failure (Zone 1 hazardous-area)
Sand ingress and 50+ °C ambient temperatures shorten bearing life; IE3/IE4 motors with food-grade grease and labyrinth seals significantly extend MTBF.
The codes that frame oil & gas procurement.
Regulatory landscape
Oil & gas procurement in MENA is governed by the operator's approved-vendor list (Aramco, ADNOC, KOC, QatarEnergy, Sonatrach, EGPC, OQ all maintain rigorous AVLs) before any national conformity scheme. Most national oil companies require pre-qualification through their portal and witness rights at the manufacturer's works during factory tests. SABER (Saudi Arabia), ECAS (UAE), G-Mark (GCC), and KEC (Kuwait) layer on top of operator AVL approval for electrical and pressure-bearing equipment. Hazardous-area equipment must carry valid IECEx or ATEX certification matched to the installation's zone classification; older Zone 1 / Zone 2 declarations must be re-validated when the certifying body changes its scope.
What buyers actually ask about oil & gas.
Can you supply NACE MR0175-compliant control valves for sour service in Iraq?+
Yes. Ball, globe and butterfly valves with NACE MR0175 / ISO 15156 material certificates, third-party inspection at origin, and the manufacturer's sour-service test reports. Stellite, hardened-stainless or ceramic trim selection per the actual H₂S concentration and operating envelope.
What ATEX/IECEx documentation do you ship with hazardous-area motors?+
Per-motor IECEx certificate, ATEX EU-type examination certificate, and the manufacturer's declaration of conformity. Zone, gas group and temperature class clearly stamped on the nameplate. Materials certificates and PMI verification at origin are routine on 50+ kW units.
How do you handle long-lead instrumentation for an LNG train expansion?+
Phased delivery aligned with the EPC contractor's installation sequence, factory acceptance testing with the buyer's witness, and full materials traceability. Cryogenic Coriolis and guided-wave radar transmitters typically need 14–22 weeks; we lock that in at FEED.
Can you mobilise a turnaround spares package in 8 weeks for an Eastern Province refinery?+
Yes — consolidated single-shipment delivery through King Abdulaziz Port (Dammam), SABER conformity coordination, and inspection at origin via SGS. The compressed window depends on whether long-lead items are on the BoM; we flag those in the first 48 hours after the BoM lands.
What buyers typically ask about Oil & Gas.
How do I verify the authenticity of a gas turbine part from a MENA supplier?+
Request the OEM's certificate of conformance and cross-check the serial number with the manufacturer's database. For critical components, consider third-party inspection. Ensure the supplier provides traceability documentation from the original mill or foundry. Avoid suppliers who cannot provide a clear chain of custody.
What are the lead times for API 6A valves in the Middle East?+
Typical lead times for API 6A valves from MENA stockists range from 4 to 12 weeks, depending on material grade and pressure class. Custom orders may take 16-20 weeks. Always confirm the valve's heat number and pressure test records. Expedited delivery is possible but verify the supplier's stock position before committing.
How can I ensure a pump meets NACE MR0175 for sour service in Saudi Arabia?+
Request the material test reports (MTRs) showing compliance with NACE MR0175/ISO 15156 for all wetted parts. The supplier should provide a NACE compliance statement and hardness test results. Verify that the pump's elastomers and coatings are also suitable for sour service. Third-party certification from a recognized body adds assurance.