Independent global supplier · Genuine OEM only · ISO 9001 / 14001 / 45001
The Power Contractor logo
The Power Contractor
Industrial Equipment & EPC
Erbil, Kurdistan Region (KRG) — The Power Contractor
🇮🇶 Iraq · Kurdistan Region (KRG)

Industrial equipment & EPC in Erbil

Erbil is the capital of the Kurdistan Region and a distinct procurement environment from federal Iraq. Equipment for the KRG-licensed oil fields, the independent power producers and the region’s construction boom typically enters from the north — overland from Turkey or by air into Erbil — which makes European-origin spares fast to land here.

We supply genuine OEM equipment and EPC scopes to the region’s oil operators, power producers, cement and steel plants and infrastructure contractors, with documentation handled for the Ibrahim Khalil border and KRG clearance.

Email the Iraq desk directly: iraq@pc-cn.com

Sectors we serve
Oil & gas — KRG-licensed fields
Independent power generation (gas)
Construction & infrastructure
Cement & steel
Manufacturing & food processing
Who we serve
KRG Ministry of Natural Resources & licensed operators
KAR Group (Khurmala, Erbil refinery)
Independent power producers (Erbil / Sulaymaniyah gas plants)
Cement, steel and building-materials plants
Regional EPC and infrastructure contractors
How equipment gets here

Routes to site

  • Erbil International Airport (EBL) — primary KRG air entry
  • Land via Turkey (Habur–Ibrahim Khalil) — 2–4 days, fast lane for European spares
  • Mersin (Turkey) port then overland for heavy plant
Why buyers in Erbil work with us

Local where it counts

  • Fast, predictable lane for European-origin equipment via Turkey
  • Documentation handled for KRG clearance at Ibrahim Khalil
  • Genuine-OEM-only sourcing with full traceability
Other Iraq markets we serve
🇮🇶 Erbil

A part number, a tag list, or a project scope — we come back the same day.