Who we serve in Morocco
MASEN (Moroccan Agency for Sustainable Energy), ONEE (Office National de l'Electricité), OCP (phosphates), and EPC contractors serving the Noor solar complex and other renewables programmes.
Morocco's renewable energy programme is one of the largest in the world. MASEN's Noor solar complex, the wind farm build-out, and the green hydrogen pilots are all active procurement environments.
We support Moroccan buyers on solar and wind BoP equipment, industrial automation for OCP's phosphate processing, and HV transmission infrastructure for ONEE.
Equipment categories with strong stock and lead time in Morocco.
How equipment gets to your site.
- Casablanca Port
- Tanger Med
- Jorf Lasfar
- Mohammed V International Airport
- Casablanca
- Rabat
- Tangier
- Marrakech
- Jorf Lasfar
- Safi
Morocco customs duties typically 2.5–10%. Clearance through Tanger Med typically 5–10 days. Strategic projects (MASEN) benefit from preferential treatment.
Shipping options to Morocco
- · Sea freight to Tanger Med, Casablanca, Jorf Lasfar
- · Air freight to Casablanca (CMN) and Rabat (RBA)
We respond in
Our Morocco desk responds within one business day on average. For urgent inquiries outside business hours, message us on WhatsApp.
What buyers typically ask about Morocco.
How do I source genuine Siemens switchgear for a substation in Casablanca without local representation?+
You can engage an independent supplier like The Power Contractor that sources directly from Siemens authorized distributors in Europe or the UAE. Ensure the supplier provides a certificate of origin and warranty documentation. For EPC services, verify their experience with local grid codes and customs clearance in Morocco.
What are the lead times for ABB transformers shipped to Tangier Med port?+
Lead times typically range 12-16 weeks from order confirmation, depending on transformer rating and customization. An independent supplier can expedite by sourcing from regional stock in Europe or the Middle East. Confirm shipping terms (CIF Tangier) and ensure compliance with Moroccan electrical standards (NM IEC).
Can I get turnkey installation for a 33kV switchgear system in Marrakech from a non-local EPC contractor?+
Yes, but the contractor must have a local partner for civil works and grid connection approvals. Independent EPC providers like The Power Contractor can manage the full scope, including procurement, logistics, and commissioning, while subcontracting local labor. Ensure the contract includes performance bonds and adherence to Moroccan safety regulations.